"*" indicates required fields
IMPORTANT: Current lead time is approximately 5–6 months from final shop drawing approval to site delivery. Our lead times reflect our commitment to quality. Every Zen product undergoes detailed production checks and quality control throughout manufacturing, with doors and windows assembled and operationally tested prior to shipment. Selected Zen steel door and window systems are also independently tested and certified to Australian Standard AS2047-2014.
Enter your details to request pricing, availability, or further information on this product.
IMPORTANT: Current lead time is approximately 4–6 months from final shop drawing approval to site delivery, depending on the size and complexity of your order. Our lead times reflect our commitment to quality. Every Zen product undergoes detailed production checks and quality control throughout manufacturing, with doors and windows assembled and operationally tested prior to shipment. Selected Zen steel door and window systems are also independently tested and certified to Australian Standard AS2047-2014.